Online

ETOPS – Extended Twin Operations EASA AMC 20-6

Annex I to ED Decision 2020/006 To provide the students with a detailed overview of the key ETOPS history, legislation, documentation and approvals and to satisfy the requirements of EASA AMC 20-6 rev.2 Effective: 23/12/2010 Annex II to ED Decision 2010/012/R of 16/12/2010 and FAA AC-120-42B – Extended Operations (ETOPS and Polar Operations) *All course modules need to be thoroughly

ETOPS – Extended Twin Operations EASA AMC 20-6 Read More »

Electrical Wiring Interconnection System – Target Group 7 & 8 (Recurrent)

*All course modules need to be thoroughly studied and at the end of each module the “next lesson” or “complete” button needs to be clicked in order for the module to be registered as complete. The green progress bar at the top can serve as an indication of the progress made. Course Duration, 1 DAY

Electrical Wiring Interconnection System – Target Group 7 & 8 (Recurrent) Read More »

Electrical Wiring Interconnection System – Target Group 6 (Recurrent)

*All course modules need to be thoroughly studied and at the end of each module the “next lesson” or “complete” button needs to be clicked in order for the module to be registered as complete. The green progress bar at the top can serve as an indication of the progress made. Objectives: Target Group 6

Electrical Wiring Interconnection System – Target Group 6 (Recurrent) Read More »

Electrical Wiring Interconnection System – Target Group 4 & 5 (Recurrent)

*All course modules need to be thoroughly studied and at the end of each module the “next lesson” or “complete” button needs to be clicked in order for the module to be registered as complete. The green progress bar at the top can serve as an indication of the progress made. Examination – yes Objectives:

Electrical Wiring Interconnection System – Target Group 4 & 5 (Recurrent) Read More »

Scroll to Top
Scroll to Top